Always wear fall-arrest protection when working aloft and needing to get the work done is never an excuse for skirting procedures. A new Mars Report describes an incident in which two crew members ignored this advice resulting in them being seriously injured.

A transcript of the incident:

While the ship was at anchor, crew members were painting in holds 1 and 4. Some of them were working aloft using the ship’s portable modular scaffolding. The chief mate and five other crew started work in hold no 1. Five sections of scaffolding were used to allow access to an area of the bulkhead up to about 9 metres above the tank top. The scaffold tower was secured by two guy ropes that had been run up out of the hold and secured on deck.

The chief mate oversaw the work from the tank top as the supervisor while two crew painted from the scaffold tower. Both wore safety harnesses with the safety lines leading up and secured to the main deck.

The remaining three crew members assisted with paint preparation, moving equipment and handling the security and safety lines. As each area of work was completed, the scaffold tower had to be repositioned to access the next area. To do this, the safety lines of the two men aloft were released and they climbed down from the scaffold tower. The lines securing the scaffold tower were then released and the tower was repositioned and re-secured. The two men climbed back up the scaffold tower and, with their safety lines re-secured, continued the work.

This process was followed throughout the morning and painting touch-ups in Hold 1 were completed before lunch. After lunch, the same work began in Hold 4. This time, however, the chief mate was not present, because he was resting in preparation for his watch. Crucially, and in contrast with the morning’s activity, neither of the two crew aloft wore safety harnesses or used the safety lines.

When the scaffold tower needed to be moved again, the two men stayed on the tower. The scaffold wheel brakes were released. As the three crew below moved the structure it suddenly toppled forward to the deck, taking the two men perched on tiers four and five with it.

First aid was quickly administered and port control advised. A helicopter was despatched and the two victims were evacuated to a shore hospital. Both men had suffered multiple serious injuries. They remained in the hospital for nineteen and eight days respectively before being repatriated.

Contributory and Risk Increasing Factors

Some of the contributing factors listed in the official report were:

  • Contrary to established procedures, two crew members remained on the unsecured scaffold tower in preparation for repositioning, rendering it top-heavy and unstable
  • The lack of formal supervision in the afternoon, plus a desire to expedite the task in difficult working conditions, probably prompted the crew members to remain unsecured on the scaffolding as it was repositioned.

The report also identified several factors that increased risk, such as:

  • The scaffold tower had several defects that reduced its stability.
  • Guidelines for the provision, care and use of the scaffold tower were not supported by suitable onboard documentation.
  • Neither crew member on the scaffold tower made use of the required safety harness and associated safety lines, which would have prevented them falling when climbing or working on the tower.

Lessons Learned

  • Where there is a strong safety culture, crew are likely to work safely, even when under their own supervision.
  • Always wear fall-arrest protection when working aloft.
  • Needing to get the work done is no excuse for skirting procedures.

Mars Reports

This is one of the May Mars Reports, originally published as Mars 201936, that are part of Report Number 320. A selection of this Report has also been published in SWZ|Maritime’s July/August issue.

Submit a Mars Report

More reports are needed to keep the scheme interesting and informative. All reports are read only by the Mars coordinator and are treated in the strictest confidence. To submit a report, please use the Mars report form and send it to mars@nautinst.org.